Time unit mismatch between maximum Load Test Run Period in "Admin Preference" and "Load Test Plan"

The "Period (min) – Load Testing" in the "Admin Preferences" for NHLBI is set to max 720 (which I assume it's minutes), however the load tests plan give warning if there are more than 720 seconds. I think the unit should be same in both places.

0
2 comments
Avatar
Rex Feizi

Hasib, 

 

Thank you for the info, it's indeed a mismatch. A ticket has been filed and this will be fixed as quickly as possible. 

0
Comment actions Permalink
Avatar
Hasib Rostaiee

Thank you Rex,

0
Comment actions Permalink